Get the ChemPriceHub app — track prices on the go. Membership syncs across app & web. View plans

Welcome to ChemPriceHub

 
Home > News > China Propylene Oxide Unit Maintenance Weekly Data Statistics (20260911)

China Propylene Oxide Unit Maintenance Weekly Data Statistics (20260911)

Published on 2026-09-11

Table: Domestic Propylene Oxide Unit Maintenance Schedule as of September 11, 2026

Region Enterprise Name Capacity (10,000 tons/year) Unit Status
Northeast Hangjin Technology 12 On September 10, a small unit malfunctioned; half-load maintenance for at least one week; the large unit is normal.
North China Tianjin Bohua 20 Unit operating at 90% load.
Tianjin Petrochemical 15 Unit operating at about 70% load.
Shandong Shandong Befar 28 Unit operating normally at full load.
Shandong Xinyue 30 Unit operating at about 80% load, with plans to gradually increase load.
Shida Shenghua 7 Unit operating normally at full load.
Wanhua Chemical 154 Units in Phases 1–4 operating at slightly reduced load.
Shandong Jinling 16 Unit operating normally at full load.
Shandong Sanyue 32 Unit operating normally at full load.
Dongying Huatai 8 Unit operating normally at full load.
Zhonghai Fine Chemical 8 Unit shut down.
Qixiang Tengda 30 Unit shut down for maintenance; may restart successively in early September; specific timing to be determined.
Jincheng Petrochemical 30 Unit shut down.
Lihuayi Weiyuan 30 Unit operating normally at full load.
Binhua New Materials 24 Unit operating at 80% load.
Minxiang Chemical 15 Unit shut down on February 13, 2026; restart time to be determined.
Dongming Guoen 8 Unit shut down on December 21, 2025; restart time to be determined.
Levima Green 30 Since August 29, the unit has gradually increased load to 70–80%; after a short shutdown this week, it has resumed operation at about 50% load.
East China Jinling Huntsman 24 Unit operating at about 80% load.
Ningbo Haian 57 Phase I unit operating at 70% load; Phase II unit shut down for maintenance on September 24, 2025.
Zhenhai Refining & Chemical 30 Unit operating at 70% load.
Hongbaoli 16 Unit shut down.
Jiangsu Fuqiang 10 Unit shut down; restart time to be determined.
Taixing Yida 15 Unit operating at about 50% load.
Jiahong New Materials 40 Unit shut down for maintenance on August 10; restarting successively this week; a small amount of product has been produced but not yet sold externally.
Zhejiang Petrochemical 27 Unit operating at 60–70% load.
Ruiheng New Materials 40 Unit operating at about 40–50% load.
Shenghong Petrochemical 20 Unit shut down for maintenance on May 28; restart expected possibly in October.
South China Sinochem Quanzhou 20 Unit operating at 90% load.
Guangxi Petrochemical 27 Unit operating at 60% load.
Central China Sinopec Changling 10 Unit operating normally at full load.

Data source: Chempricehub Information.

Comments

0
No comments yet.