Table: Domestic Propylene Oxide Unit Maintenance Schedule on September 4, 2026

Region Enterprise Name Capacity (10,000 t/y) Unit Status
Northeast China Hangjin Technology 12 Unit operating at full load under normal conditions
North China Tianjin Bohua 20 Unit operating at 90% load
Tianjin Petrochemical 15 Unit operating at approximately 90% load
Shandong Shandong Binhua 28 Unit operating at full load under normal conditions
Shandong Xinyue 30 Unit load reduced to 80% on September 4 due to column cleaning; expected to last 5–7 days
Shida Shenghua 7 Unit shut down on August 22 for column cleaning; restarted and ramped up to full load starting August 29
Wanhua Chemical 154 Units 1–4 operating at slightly reduced load
Shandong Jinling 16 Unit operating at full load under normal conditions
Shandong Sanyue 32 Unit temporarily load-reduced on August 28 due to power plant impact; ramped to full load on September 1
Dongying Huatai 8 Unit operating at full load under normal conditions
CNOOC Fine Chemical 8 Unit shut down
Qixiang Tengda 30 Unit shut down for maintenance; upstream propylene is currently being restarted, PO restart may be possible around mid-month
Jincheng Petrochemical 30 Unit shut down
Lihuayi Weiyuan 30 Unit operating at full load under normal conditions
Binhu New Materials 24 Unit operating at 80% load
Minxiang Chemical 15 Unit shut down on February 13, 2026; resumption time to be determined
Dongming Guoen 8 Unit shut down on December 21, 2025; resumption time to be determined
Lianhong Gerun 30 Unit shut down for maintenance on July 10; gradually ramped up to 70–80% load since August 29
East China Jinling Huntsman 24 Unit operating at approximately 80% load
Ningbo Hai'an 57 Phase I unit operating at 70% load; Phase II unit shut down for maintenance on September 24, 2025
Zhenhai Refining & Chemical 30 Unit operating at 70% load
Hongbaoli 16 Unit shut down
Jiangsu Fuqiang 10 Unit shut down; resumption time to be determined
Taixing Yida 15 Unit operating at approximately 50% load
Jiahong New Materials 40 Unit shut down for maintenance on August 10; expected to last one month
Zhejiang Petrochemical 27 Unit operating at 60–70% load
Ruiheng New Materials 40 Unit operating at approximately 50–60% load
Shenghong Petrochemical 20 Unit shut down for maintenance on May 28; expected to last 3–4 months
South China Sinochem Quanzhou 20 Unit operating at 90% load
Guangxi Petrochemical 27 Unit operating at 60% load
Central China Sinopec Changling 10 Unit operating at full load under normal conditions