| Fushun Petrochemical |
9.2 |
0% |
Shut down in early March; restart date to be determined. |
| Jilin Petrochemical |
68.4 |
85% |
Load reduced to 50% from mid-April to mid-May; one 130,000-ton line shut down for maintenance on June 1 and resumed in July; No. 1 PP unit and No. 3 PP Line A shut down for maintenance in late July; No. 3 PP Line A resumed on August 18; No. 1 PP unit scheduled to resume in the second half of September. |
| Daqing Petrochemical |
8 |
0% |
Shut down for maintenance on September 7 for about two weeks. |
| Daqing Refining & Chemical |
8 |
100% |
None. |
| Anqing Petrochemical |
21 |
0% |
Reduced load in late January and increased load in mid-March; 80,000-ton unit shut down on September 2 and 130,000-ton unit shut down on September 8; expected to last 40–50 days. |
| Shandong Haijiang |
13 |
100% |
Shut down for maintenance on December 25, 2025, and restarted on February 8, 2026; short unplanned shutdown due to malfunction from August 19 to 21. |
| Kelu'er |
26 |
100% |
Shut down for maintenance starting April 23; gradually restarted and resumed on June 23. |
| Shanghai SECCO |
52 |
50% |
One unit has been operating since March 2025; one line was under maintenance from May 6 to 21, reducing load to 25%. |
| Sailboat |
104 |
70% |
Operation reduced from three units to two starting January 20; restored to three units at the end of March; reduced to two units in June; reduced to one unit in July; gradually restored to three units in early September. |
| Lanzhou Petrochemical |
3.5 |
90% |
None. |
| Zhejiang Petrochemical |
52 |
75% |
Reduced load for maintenance in late January and gradually increased load in February; one unit shut down at the end of March; one line resumed in mid-May and the other line resumed on June 20; one line shut down for maintenance due to malfunction from August 14 to 27; one line shut down again in early September, with restart date to be determined. |
| Lihuayi |
26 |
100% |
Short shutdown for repair due to malfunction on July 28, restarted and resumed on August 5. |
| Tianchen Qixiang |
13 |
100% |
Reduced load in mid-March; shut down for maintenance in early July and resumed on August 20. |
| Liaoning Kingfa |
26 |
100% |
One 130,000-ton production line was under maintenance starting August 13 and resumed in early September. |
| Jihua (Jieyang) |
13 |
90% |
Shut down for maintenance due to malfunction starting January 20 and restarted on February 10; short unplanned shutdown due to malfunction from July 29 to August 3; maintenance scheduled in December. |
| CNOOC Fudao |
20 |
95% |
Shut down for maintenance on March 30; one line resumed at the end of April and the other line resumed in early May. |
| Yulong Petrochemical |
26 |
95% |
Line 2 successfully started up in early February. |
| Sinochem Quanzhou |
26 |
90% |
Full-line shutdown for maintenance in mid-September 2025; gradually restarted around June 25. |
| Zhenhai Refining & Chemical |
40 |
80% |
Reduced load in late January; reduced to 80% in July; reduced to 50% starting August 10 and gradually restored in early September. |
| Total |
555.1 |
77.3% |
|