Table: Domestic Propylene Oxide Plant Maintenance Schedule – September 25, 2026
| Region | Enterprise Name | Capacity (10k t/a) | Unit Status |
|---|---|---|---|
| Northeast | Hangjin Technology | 12 | Small unit suffered a fault on Sep. 10; under maintenance at half load. Large unit underwent column cleaning on the 21st at half load; large unit resumed operation on the 23rd. |
| North China | Tianjin Bohua | 20 | Operating at approx. 90% load. |
| Tianjin Petrochemical | 15 | Operating at approx. 90% load. | |
| Shandong | Shandong Binhua | 28 | Normal full-load operation. |
| Shandong Xinyue | 30 | Operating at approx. 90% load. | |
| Shida Shenghua | 7 | Normal full-load operation. | |
| Wanhua Chemical | 154 | Phases 1–4 operating at slightly reduced load. | |
| Shandong Jinling | 16 | Normal full-load operation. | |
| Shandong Sanyue | 32 | Normal full-load operation. | |
| Dongying Huatai | 8 | Normal full-load operation. | |
| CNOOC Fine Chemicals | 8 | Shut down. | |
| Qixiang Tengda | 30 | Operating at approx. 70% load. | |
| Jincheng Petrochemical | 30 | Shut down. | |
| Lihua Yiweiyuan | 30 | Normal full-load operation. | |
| Binhua New Materials | 24 | Previously reduced to approx. 50% load; gradually ramping up to full capacity since the 22nd. | |
| Minxiang Chemical | 15 | Shut down on Feb. 13, 2026; restart date TBD. | |
| Dongming Guoen | 8 | Shut down on Dec. 21, 2025; potential future restart indicated. | |
| Lianhong Gerun | 30 | Operating at 70–80% load. | |
| East China | Jinling Huntsman | 24 | Operating at approx. 80% load. |
| Ningbo Haian | 57 | Phase I operating at approx. 90% load. Phase II shut down for maintenance on Sep. 24, 2025. | |
| Zhenhai Refining & Chemical | 30 | Operating at approx. 90% load. | |
| Hongbaoli | 16 | Shut down. | |
| Jiangsu Fuqiang | 10 | Shut down; restart date TBD. | |
| Taixing Yida | 15 | Shut down. | |
| Jiahong New Materials | 40 | Operating at approx. 50–60% load. | |
| Zhejiang Petrochemical | 27 | Load slightly reduced to 30–40% on the 16th; expected to recover around the weekend. | |
| Ruiheng New Materials | 40 | Operating at approx. 60–70% load. | |
| Shenghong Petrochemical | 20 | Shut down for maintenance on May 28; potential restart expected in October. | |
| South China | Sinochem Quanzhou | 20 | Operating at approx. 90% load. |
| Guangxi Petrochemical | 27 | Operating at approx. 60% load. | |
| Central China | Sinopec Changling | 10 | Normal full-load operation. |
Data Source: Chempricehub Information
Comments
0