Get the ChemPriceHub app — track prices on the go. Membership syncs across app & web. View plans
 
Summary Historical Data Suppliers Capacity Watch Landed Cost FX

Propylene oxide Capacity

20261016 23 producers
Producer Capacity (10kt) Utilization % Remark
Befar Group Co., Ltd. 28.00 - The plant is currently operating at full capacity under normal conditions. A planned shutdown for maintenance of the Dongrui 80,000-ton/year unit is tentatively scheduled for November, with the downstream polyether units to be shut down simultaneously. The expected duration of the outage is 14 days.
Dongying Huatai Chemical Group Co., Ltd. 🔒 🔒 The unit will operate at half load starting from October 15, with an expected duration of 6 days.
Hangjin Technology Co., Ltd. 🔒 🔒 The 40,000-ton small-scale unit experienced a failure on September 10 and is undergoing maintenance at half load, which may continue until the end of the year. Meanwhile, the large-scale unit is operating normally at full capacity.
Hangzhou Jiahong New Materials Technology Co., Ltd. 🔒 🔒 The unit is operating at approximately 70-80% of its design capacity.
Huizhou Jincheng Petrochemical Equipment Engineering Co., Ltd. 🔒 🔒 Plant shutdown
Jiangsu Fuqiang New Material Co., Ltd. 🔒 🔒 Plant Shutdown
Lihuayi Weiyuan Chemical Co., Ltd. 🔒 🔒 The plant is operating at full capacity under normal conditions.
Nanjing Jinling Huntsman New Material Co., Ltd. 🔒 🔒 The unit is operating at approximately 80% of its design capacity.
Ninghai Hai'an Environmental Protection Technology Trade Service Co., Ltd. 🔒 🔒 The Phase I unit is operating at 90% load, while the Phase II unit will undergo a scheduled shutdown for maintenance on September 24, 2025.
Shandong Binhua New Material Co., Ltd. 🔒 🔒 The unit is operating at normal full capacity.
Shandong Jinling Group Co., Ltd. 🔒 🔒 The unit is operating at normal full capacity. A scheduled shutdown for maintenance is tentatively planned for October 20, with an estimated duration of 7 to 10 days.
Shandong Sanyue Chemical Co., Ltd. 🔒 🔒 The unit will undergo a shutdown for maintenance on October 14. Subsequently, one line may be restarted for operation; the specific plan is to be determined.
Shandong Zhonghai FINE Chemical Industry Co., Ltd. 🔒 🔒 Plant Shutdown
Shenghong Petrochemical Group Co., Ltd. 🔒 🔒 The unit will undergo shutdown and maintenance on May 28. The restart date is to be determined (TBD).
Shinghwa Advanced Material Group Co., Ltd. 🔒 🔒 The unit is operating at normal full load.
Sinochem Quanzhou Petrochemical Co., Ltd. 🔒 🔒 The plant is operating at 90% of its capacity.
Sinopec Group Asset Management Co., Ltd. Changling Branch 🔒 🔒 The plant is operating at full capacity under normal conditions.
Sinopec Ningbo Zhenhai Refining & Chemical Company Limited 🔒 🔒 The plant is operating at 90% capacity.
Sinopec/sabic Tianjin Petrochemical Company Limited 🔒 🔒 The unit is operating at full capacity under normal conditions.
Tianjin Bohai Chemical Group Co., Ltd. 🔒 🔒 The unit is operating at 90% load.
Wanhua Chemical Group Co., Ltd. 🔒 🔒 Units 1–4 are operating at slightly reduced loads. A further reduction in throughput for Unit 3 may occur by the end of the month, with specifics to be confirmed.
Zhejiang Petroleum&Chemical Co., Ltd. 🔒 🔒 The unit is operating at 70–80% load, with the annual turnaround tentatively scheduled for early November.
Zibo Qixiang Tengda Chemical Co., Ltd. 🔒 🔒 The unit has been slightly reduced to operate at approximately 60% load.
20260928 23 producers
Producer Capacity (10kt) Utilization % Remark
Befar Group Co., Ltd. 🔒 🔒 Operating at 80–90% overall load
CNOOC and Shell Petrochemicals Company Limited 🔒 🔒 Full-load operation of the unit
Dongying Huatai Chemical Group Co., Ltd. 🔒 🔒 The unit is operating at full capacity under normal conditions.
Hangjin Technology Co., Ltd. 🔒 🔒 The unit is operating normally at full capacity.
Hangzhou Jiahong New Materials Technology Co., Ltd. 🔒 🔒 The unit is shut down, with the restart time to be determined (TBD).
Huizhou Jincheng Petrochemical Equipment Engineering Co., Ltd. 🔒 🔒 Shutdown on July 17, 2023; restart date TBD.
Jiangsu Fuqiang New Material Co., Ltd. 🔒 🔒 The unit has been shut down, and the restart time is to be determined (TBD).
Lihuayi Weiyuan Chemical Co., Ltd. 🔒 🔒 The unit is operating at 80–90% of its design capacity.
Nanjing Jinling Huntsman New Material Co., Ltd. 🔒 🔒 Normal full-load operation
Ninghai Hai'an Environmental Protection Technology Trade Service Co., Ltd. 🔒 🔒 Phase I and Phase II are operating at full capacity under normal conditions.
Shandong Binhua New Material Co., Ltd. 🔒 🔒 Operating at approximately 80-90% load
Shandong Jinling Group Co., Ltd. 🔒 🔒 The plant is operating at normal full capacity.
Shandong Sanyue Chemical Co., Ltd. 🔒 🔒 The unit is operating at a slightly reduced load.
Shandong Zhonghai FINE Chemical Industry Co., Ltd. 🔒 🔒 The unit has been restarted and is currently operating at 70% capacity.
Shenghong Petrochemical Group Co., Ltd. 🔒 🔒 The unit is operating at 80% load.
Shinghwa Advanced Material Group Co., Ltd. 🔒 🔒 The unit is operating at full capacity under normal conditions.
Sinochem Quanzhou Petrochemical Co., Ltd. 🔒 🔒 Operating at approximately 80% load
Sinopec Group Asset Management Co., Ltd. Changling Branch 🔒 🔒 The unit is operating normally.
Sinopec/sabic Tianjin Petrochemical Company Limited 🔒 🔒 The unit is operating at 70% load.
Tianjin Bohai Chemical Group Co., Ltd. 🔒 🔒 The unit is operating at 70% load.
Wanhua Chemical Group Co., Ltd. 🔒 🔒 Phases 1, 2, and 3 are operating at full capacity under normal conditions, while Phase 4 is running at approximately 60% load.
Zhejiang Petroleum&Chemical Co., Ltd. 🔒 🔒 Operating at approximately 70% load
Zibo Qixiang Tengda Chemical Co., Ltd. 🔒 🔒 Shutdown on August 7, 2024; the restart plan has been temporarily postponed.
20260925 23 producers
Producer Capacity (10kt) Utilization % Remark
Befar Group Co., Ltd. 🔒 🔒 The plant is operating at full capacity under normal conditions.
Dongying Huatai Chemical Group Co., Ltd. 🔒 🔒 The plant is operating at normal full capacity.
Hangjin Technology Co., Ltd. 🔒 🔒 On September 10, a minor unit experienced a failure and was taken offline for maintenance at half capacity. On September 21, the major unit underwent column cleaning while operating at half capacity. The major unit was restored to full operation on September 23.
Hangzhou Jiahong New Materials Technology Co., Ltd. 🔒 🔒 The unit is operating at approximately 50–60% of its capacity.
Huizhou Jincheng Petrochemical Equipment Engineering Co., Ltd. 🔒 🔒 Plant shutdown
Jiangsu Fuqiang New Material Co., Ltd. 🔒 🔒 Unit shutdown; restart time TBD
Lihuayi Weiyuan Chemical Co., Ltd. 🔒 🔒 The unit is operating at normal full load.
Nanjing Jinling Huntsman New Material Co., Ltd. 🔒 🔒 The unit is operating at approximately 80% of its design capacity.
Ninghai Hai'an Environmental Protection Technology Trade Service Co., Ltd. 🔒 🔒 Unit I is operating at 90% load. Unit II will undergo a scheduled shutdown for maintenance on September 24, 2025.
Shandong Binhua New Material Co., Ltd. 🔒 🔒 The unit initially operated at a reduced load of approximately 50% capacity, with the load gradually increased to full capacity starting from the 22nd.
Shandong Jinling Group Co., Ltd. 🔒 🔒 The unit is operating normally at full capacity.
Shandong Sanyue Chemical Co., Ltd. 🔒 🔒 The unit is operating at normal full load.
Shandong Zhonghai FINE Chemical Industry Co., Ltd. 🔒 🔒 Unit Shutdown
Shenghong Petrochemical Group Co., Ltd. 🔒 🔒 The unit is scheduled for a shutdown maintenance on May 28, with a potential restart expected in October.
Shinghwa Advanced Material Group Co., Ltd. 🔒 🔒 The unit is operating at normal full capacity.
Sinochem Quanzhou Petrochemical Co., Ltd. 🔒 🔒 The unit is operating at 90% capacity.
Sinopec Group Asset Management Co., Ltd. Changling Branch 🔒 🔒 The unit is operating at full capacity under normal conditions.
Sinopec Ningbo Zhenhai Refining & Chemical Company Limited 🔒 🔒 The unit is operating at 90% load.
Sinopec/sabic Tianjin Petrochemical Company Limited 🔒 🔒 The unit is operating at approximately 90% load.
Tianjin Bohai Chemical Group Co., Ltd. 🔒 🔒 The plant is operating at 90% capacity.
Wanhua Chemical Group Co., Ltd. 🔒 🔒 Units 1–4 are operating at slightly reduced loads.
Zhejiang Petroleum&Chemical Co., Ltd. 🔒 🔒 The unit reduced its load slightly on the 16th to operate at 30–40% capacity, with a return to full operation expected around the weekend.
Zibo Qixiang Tengda Chemical Co., Ltd. 🔒 🔒 The unit is operating at approximately 70% load.
20260918 23 producers
Producer Capacity (10kt) Utilization % Remark
Befar Group Co., Ltd. 🔒 🔒 The unit is operating at normal full load.
Dongying Huatai Chemical Group Co., Ltd. 🔒 🔒 The unit is operating at full capacity under normal conditions.
Hangjin Technology Co., Ltd. 🔒 🔒 On September 10, the small-scale unit experienced a malfunction and underwent maintenance at half load, while the large-scale unit operated normally.
Hangzhou Jiahong New Materials Technology Co., Ltd. 🔒 🔒 The unit is operating at approximately 50–60% load.
Huizhou Jincheng Petrochemical Equipment Engineering Co., Ltd. 🔒 🔒 Unit Shutdown
Jiangsu Fuqiang New Material Co., Ltd. 🔒 🔒 The unit has been shut down, with the restart time to be determined.
Lihuayi Weiyuan Chemical Co., Ltd. 🔒 🔒 The plant is operating at normal full capacity.
Nanjing Jinling Huntsman New Material Co., Ltd. 🔒 🔒 The unit is operating at approximately 80% load.
Ninghai Hai'an Environmental Protection Technology Trade Service Co., Ltd. 🔒 🔒 The Phase I unit is operating at 90% capacity. The Phase II unit will undergo a scheduled shutdown for maintenance on September 24, 2025.
Shandong Binhua New Material Co., Ltd. 🔒 🔒 The unit has been slightly throttled down to operate at 50% load.
Shandong Jinling Group Co., Ltd. 🔒 🔒 The unit is operating at full capacity under normal conditions.
Shandong Sanyue Chemical Co., Ltd. 🔒 🔒 The plant is operating at full capacity under normal conditions.
Shandong Zhonghai FINE Chemical Industry Co., Ltd. 🔒 🔒 Unit shutdown
Shenghong Petrochemical Group Co., Ltd. 🔒 🔒 The unit was shut down for maintenance on May 28, with a potential restart expected in October.
Shinghwa Advanced Material Group Co., Ltd. 🔒 🔒 The unit is operating at full capacity under normal conditions.
Sinochem Quanzhou Petrochemical Co., Ltd. 🔒 🔒 The unit is operating at 90% capacity.
Sinopec Group Asset Management Co., Ltd. Changling Branch 🔒 🔒 The unit is operating at normal full load.
Sinopec Ningbo Zhenhai Refining & Chemical Company Limited 🔒 🔒 The plant is operating at 90% capacity.
Sinopec/sabic Tianjin Petrochemical Company Limited 🔒 🔒 The unit is operating at approximately 90% of its capacity.
Tianjin Bohai Chemical Group Co., Ltd. 🔒 🔒 The unit is operating at 90% load.
Wanhua Chemical Group Co., Ltd. 🔒 🔒 Units 1-4 are operating at slightly low loads.
Zhejiang Petroleum&Chemical Co., Ltd. 🔒 🔒 The unit was slightly de-loaded on the 16th and operated at a load of 30–40%.
Zibo Qixiang Tengda Chemical Co., Ltd. 🔒 🔒 The unit has been gradually restarted this week and is currently operating at approximately 60% load.
20260911 22 producers
Producer Capacity (10kt) Utilization % Remark
Befar Group Co., Ltd. 🔒 🔒 The unit is operating normally at full load.
Dongying Huatai Chemical Group Co., Ltd. 🔒 🔒 The unit is operating normally at full load.
Hangjin Technology Co., Ltd. 🔒 🔒 Plant: On September 10, the small unit experienced a malfunction and will undergo maintenance at half load for at least one week, while the large unit is operating normally.
Hangzhou Jiahong New Materials Technology Co., Ltd. 🔒 🔒 The unit was shut down for maintenance on August 10 and has been gradually restarted this week; a small amount of product has been produced but has not yet been sold externally.
Huizhou Jincheng Petrochemical Equipment Engineering Co., Ltd. 🔒 🔒 Unit shutdown
Jiangsu Fuqiang New Material Co., Ltd. 🔒 🔒 Plant shutdown, resumption time to be determined
Lihuayi Weiyuan Chemical Co., Ltd. 🔒 🔒 The unit is operating normally at full load.
Nanjing Jinling Huntsman New Material Co., Ltd. 🔒 🔒 The plant is operating at approximately 80% load.
Ninghai Hai'an Environmental Protection Technology Trade Service Co., Ltd. 🔒 🔒 Phase I unit is operating at 70% load. Phase II unit was shut down for maintenance on September 24, 2025.
Shandong Binhua New Material Co., Ltd. 🔒 🔒 The unit is operating at 80% load.
Shandong Jinling Group Co., Ltd. 🔒 🔒 The unit is operating normally at full load.
Shandong Sanyue Chemical Co., Ltd. 🔒 🔒 The unit is operating normally at full load.
Shandong Zhonghai FINE Chemical Industry Co., Ltd. 🔒 🔒 Plant shutdown
Shenghong Petrochemical Group Co., Ltd. 🔒 🔒 The unit was shut down for maintenance on May 28, with a potential restart expected in October.
Shinghwa Advanced Material Group Co., Ltd. 🔒 🔒 The unit is operating normally at full load.
Sinochem Quanzhou Petrochemical Co., Ltd. 🔒 🔒 The plant is operating at 90% load.
Sinopec Ningbo Zhenhai Refining & Chemical Company Limited 🔒 🔒 The unit is operating at 70% load.
Sinopec/sabic Tianjin Petrochemical Company Limited 🔒 🔒 The unit is operating at approximately 70% load.
Tianjin Bohai Chemical Group Co., Ltd. 🔒 🔒 The unit is operating at 90% capacity.
Wanhua Chemical Group Co., Ltd. 🔒 🔒 Units in Phases 1–4 are operating at slightly reduced load.
Zhejiang Petroleum&Chemical Co., Ltd. 🔒 🔒 The unit is operating at 60-70% load.
Zibo Qixiang Tengda Chemical Co., Ltd. 🔒 🔒 The unit is under maintenance shutdown and may be restarted successively in early September; the exact timing is TBD.
20260910 1 producer
Producer Capacity (10kt) Utilization % Remark
Wudi Xinyue Chemical Group Co., Ltd. 🔒 🔒 During the week, operated under slightly reduced load.
20260904 20 producers
Producer Capacity (10kt) Utilization % Remark
Befar Group Co., Ltd. 🔒 🔒 The unit is operating normally at full load.
Dongying Huatai Chemical Group Co., Ltd. 🔒 🔒 The plant is operating normally at full load.
Hangjin Technology Co., Ltd. 🔒 🔒 Unit in normal full-load operation
Hangzhou Jiahong New Materials Technology Co., Ltd. 🔒 🔒 The unit was shut down for maintenance on August 10, and the shutdown is expected to last one month.
Huizhou Jincheng Petrochemical Equipment Engineering Co., Ltd. 🔒 🔒 Unit shutdown
Jiangsu Fuqiang New Material Co., Ltd. 🔒 🔒 Unit shutdown, restart time to be determined.
Lihuayi Weiyuan Chemical Co., Ltd. 🔒 🔒 The plant is operating normally at full load.
Nanjing Jinling Huntsman New Material Co., Ltd. 🔒 🔒 The unit is operating at approximately 80% load.
Ninghai Hai'an Environmental Protection Technology Trade Service Co., Ltd. 🔒 🔒 Phase I unit operating at 70% load; Phase II unit shut down for maintenance on September 24, 2025.
Shandong Binhua New Material Co., Ltd. 🔒 🔒 The unit is operating at 80% load.
Shandong Jinling Group Co., Ltd. 🔒 🔒 Plant under normal full-load operation
Shandong Sanyue Chemical Co., Ltd. 🔒 🔒 After a short-term load reduction due to power plant impact on August 28, the unit was brought back to full load on September 1.
Shandong Zhonghai FINE Chemical Industry Co., Ltd. 🔒 🔒 Plant shutdown (or **unit shutdown**, if referring to a specific process unit)
Shenghong Petrochemical Group Co., Ltd. 🔒 🔒 The unit was shut down for maintenance on May 28 and is expected to remain offline for 3–4 months.
Shinghwa Advanced Material Group Co., Ltd. 🔒 🔒 The unit was shut down on August 22 for tower cleaning and was progressively restarted and ramped up to full capacity on August 29.
Sinopec Ningbo Zhenhai Refining & Chemical Company Limited 🔒 🔒 The unit is operating at 70% load.
Sinopec/sabic Tianjin Petrochemical Company Limited 🔒 🔒 The plant operates at approximately 90% load.
Tianjin Bohai Chemical Group Co., Ltd. 🔒 🔒 The unit is operating at 90% load.
Wanhua Chemical Group Co., Ltd. 🔒 🔒 Units in Phase 1-4 are operating at slightly reduced load.
Zibo Qixiang Tengda Chemical Co., Ltd. 🔒 🔒 The plant is shut down for maintenance. The upstream propylene unit is currently being restarted, and there may be a possibility of restarting PO in mid-month.

More capacity data available

Sign in to view more capacity and utilization data.